Tryouts & Practice Times Now Posted, News, U7, Intertown (Langton Minor Hockey)

News Article
News Article Image
Organization | Aug 14, 2016 | LMHA | 18103 views
Tryouts & Practice Times Now Posted
Tryout times and dates have now been posted for Novice Rep, Peewee Rep & Midget Rep.
Practice times and dates have also been posted for all other teams in our association for September.


* Please note that all ice times are at Delhi Arena *

If you're unsure what age division your child falls under click here

Other News
Sponsors
Myron Graves
519-718-0060
Erie Shores Wind Farm
Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/generators located along the north shore of Lake Erie between Copenhagen and Clear Creek, Ontario. The electrical energy generated by the wind turbines is collected and delivered by 34.5 kV lines, which ultimately deliver the power to the Port Burwell substation. At the substation, the voltage is increased to 115 kV for delivery to Ontario’s transmission grid. All electricity generated by Erie Shores is sold to the Ontario Power Authority under a power purchase agreement. Erie Shores is one of the largest wind power facilities in Ontario, representing approximately 4.8% of Ontario’s installed wind power capacity.
Bailey Trucking
Excavating and Demolition Services Licensed Septic Design and Construction Mike Thompson 519-983-0285 Al Bailey 519-983-3085 [email protected]