IN-PERSON REGISTRATION THURS AUG 11 from 6-8pm, News (Langton Minor Hockey)

News Article
News Article Image
Jun 21, 2022 | Jess Brown | 1502 views
IN-PERSON REGISTRATION THURS AUG 11 from 6-8pm
We will be in the minor hockey room at Langton Arena this Thursday Aug 11 from 6-8 pm doing in-person registration - check out the registration tab on our website for info and downloadable form.  Those registering for U5-U8, please bring a copy of your child's birth certificate so we can update the registry portal. 

Hope to see you there !

Sponsors
Erie Shores Wind Farm
Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/generators located along the north shore of Lake Erie between Copenhagen and Clear Creek, Ontario. The electrical energy generated by the wind turbines is collected and delivered by 34.5 kV lines, which ultimately deliver the power to the Port Burwell substation. At the substation, the voltage is increased to 115 kV for delivery to Ontario’s transmission grid. All electricity generated by Erie Shores is sold to the Ontario Power Authority under a power purchase agreement. Erie Shores is one of the largest wind power facilities in Ontario, representing approximately 4.8% of Ontario’s installed wind power capacity.
Bailey Trucking
Excavating and Demolition Services Licensed Septic Design and Construction Mike Thompson 519-983-0285 Al Bailey 519-983-3085 [email protected]
Dockside Optometry
HIGH QUALITY EYECARE FROM LOCAL SPECIALISTS Our optometrist and staff care about you and your family. Questions? Please call us at (519) 586-3625