Langton Leafs U11 LL -are in the FINALS, News (Langton Minor Hockey)

News Article
News Article Image
Mar 29, 2022 | LAMHA | 871 views
Langton Leafs U11 LL -are in the FINALS
Puck drops tonight (Mar 29) at 6 pm - Talbot Arena, Simcoe 

Come out and support our Langton Leafs U11 LL as they take the ice for game 2 in a best of 3 series for the championship.

Game 3 is scheduled for Wed Mar 30 at 7 pm - Talbot Arena in Simcoe 

Sponsors
Bailey Trucking
Excavating and Demolition Services Licensed Septic Design and Construction Mike Thompson 519-983-0285 Al Bailey 519-983-3085 [email protected]
Dockside Optometry
HIGH QUALITY EYECARE FROM LOCAL SPECIALISTS Our optometrist and staff care about you and your family. Questions? Please call us at (519) 586-3625
Erie Shores Wind Farm
Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/generators located along the north shore of Lake Erie between Copenhagen and Clear Creek, Ontario. The electrical energy generated by the wind turbines is collected and delivered by 34.5 kV lines, which ultimately deliver the power to the Port Burwell substation. At the substation, the voltage is increased to 115 kV for delivery to Ontario’s transmission grid. All electricity generated by Erie Shores is sold to the Ontario Power Authority under a power purchase agreement. Erie Shores is one of the largest wind power facilities in Ontario, representing approximately 4.8% of Ontario’s installed wind power capacity.