Pictures, News (Langton Minor Hockey)

News Article
News Article Image
Jan 23, 2018 | LMHA | 1813 views
Pictures
Individual & team pictures will be taken on 3 different days this year - Jan 31st, Feb 1st and Feb 3rd.

Pictures will take place 45 minutes before your team's scheduled practice or game, so all teams need to be dressed with forms filled out 45 minutes before your ice time.

Schedules for dates and times will be posted at the arena.

Forms will be available in the minor hockey room on Jan 23rd to be picked up by coaches for their respective teams which are labelled along with dates & times.
Sponsors
Myron Graves
519-718-0060
Erie Shores Wind Farm
Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/generators located along the north shore of Lake Erie between Copenhagen and Clear Creek, Ontario. The electrical energy generated by the wind turbines is collected and delivered by 34.5 kV lines, which ultimately deliver the power to the Port Burwell substation. At the substation, the voltage is increased to 115 kV for delivery to Ontario’s transmission grid. All electricity generated by Erie Shores is sold to the Ontario Power Authority under a power purchase agreement. Erie Shores is one of the largest wind power facilities in Ontario, representing approximately 4.8% of Ontario’s installed wind power capacity.